IMME Project

Building Uganda's Expressway Knowledge Infrastructure

Integrated lifecycle manuals and a bridge management system pilot — KOICA-funded Korea–Uganda cooperation, owned by Uganda's Ministry of Works and Transport after handover in April 2026.

Live roadmap

Step 12 / 183rd Workshop

Consortium
  • KOICA
  • MoWT Uganda
  • KEC
  • DOHWA
  • CHEIL

USD 7.5M

Total budget

40→48months

Project duration (Jan 2023 – Dec 2026)

6manual types

To be handed over to MoWT

4bridges

BMS pilot on Kampala–Entebbe Expressway

Our development strategy

Four pillars that keep the manuals usable, not shelved.

  • 1

    Localization

    Aligned with Uganda's institutions, laws, and ongoing projects.

  • 2

    Applicability

    Detailed procedures usable in real workflows, not theoretical.

  • 3

    Consistency

    Unified format across all six manual types.

  • 4

    Searchability

    Coded items, pictorial illustration, smartphone-ready.

Where we are

Project roadmap at a glance

Kickoff (Jan 2023) → Site Survey → Literature Review → 1st Workshop → 1st Invitation (Korea) → 2nd Workshop → Draft Manuals (OJT) → 3rd Workshop [NOW] → Final Manuals → Handover (Apr 2026) → Final Reporting (Sep 2026).

View full roadmap
  1. Step 9

    2nd Invitation Program (Korea)

    Oct 2024

  2. Step 10

    Draft Manual

    Late 2024

  3. Step 11

    OJT (6 months)

    2025

  4. Step 12

    3rd Workshop

    Sep 2025

    We are here

  5. Step 13

    Final Manual

    Nov 2025

  6. Step 14

    Consulting

    Dec 2025 – Mar 2026

  7. Step 15

    Handover (6 manual types to MoWT)

    Apr 2026

Latest update

From the project office

All news
WorkshopSep 2025

3rd Technical Workshop convened in Kampala

MoWT and the KEC-led consortium reviewed draft manuals and aligned on BMS integration steps for the Kampala–Entebbe pilot.

Read more updates

A program, not a report

Practical tools for Uganda's expressway sector — designed for the field, not the shelf.